Home Services Projects About Contact

News &
Insights

Engineering perspectives, industry trends, and updates from the FuZhen team.

02 March 2026 Regulatory

Understanding PCAB Licensing for Engineering Firms in the Philippines

The Philippine Contractors Accreditation Board sets strict licensing requirements that affect every engineering firm operating in-country. We break down what each license category covers, how to qualify, and what happens if you proceed without proper accreditation.

Read Article
03 February 2026 Technical

AutoCAD vs BIM: Which Does Your Project Actually Need?

Many clients come to us uncertain whether 2D AutoCAD drafting or full BIM modelling is the right fit for their scope. The answer depends on project complexity, coordination requirements, and long-term asset management goals — not simply budget.

Read Article
04 February 2026 Business

Philippine Payroll Compliance: What Singapore Companies Miss

Singapore-based firms expanding into the Philippines routinely underestimate the compliance complexity of local payroll — SSS, PhilHealth, Pag-IBIG contributions, 13th month pay, and final pay obligations all carry specific computation rules that differ significantly from Singapore’s CPF framework.

Read Article
05 January 2026 Engineering

Fire Protection Design Standards Under NFPA and Local Codes

Philippine fire protection design sits at the intersection of international NFPA standards and local Bureau of Fire Protection requirements. We cover the key differences, where conflicts arise in practice, and how integrated MEPF design teams resolve them before construction begins.

Read Article
06 January 2026 Business

Company Setup in the Philippines: A Step-by-Step Guide for Foreign Investors

From SEC registration to BIR enrollment, local government permits, and industry-specific clearances, establishing a foreign-owned entity in the Philippines requires navigating several overlapping agencies. This guide maps the full sequence — and the common bottlenecks to plan around.

Read Article
07 December 2025 Industry

MEPF Coordination: How Integrated Design Saves Time and Money

When mechanical, electrical, plumbing, and fire protection teams work in silos, clash detection happens on-site rather than in the model — and that costs far more than coordination ever would. We examine how integrated MEPF design changes the economics of large-scale construction projects in the Philippines.

Read Article

Your Vision,
Our Engineering Solutions.